{"id":1026,"date":"2012-08-31T09:57:51","date_gmt":"2012-08-31T09:57:51","guid":{"rendered":"https:\/\/www.sistemaingenieria.com\/?p=1026"},"modified":"2018-11-22T16:00:13","modified_gmt":"2018-11-22T16:00:13","slug":"servicios-para-asistencia-tecnica-a-la-direccion-control-y-vigilancia-de-las-obras-de-fuerteventura","status":"publish","type":"post","link":"http:\/\/3.65.241.247\/en\/servicios-para-asistencia-tecnica-a-la-direccion-control-y-vigilancia-de-las-obras-de-fuerteventura\/","title":{"rendered":"Technical Assistance Services for the Management, Monitoring and Supervision of Fuerteventura Projects"},"content":{"rendered":"<p>The Ministry of Agriculture, Livestock, Fisheries and Water of the Government of the Canary Islands has awarded the contract for &#8220;Technical Assistance Services for the Management, Monitoring and Supervision of Fuerteventura Projects&#8221; to SISTEMA INGENIERIA.<\/p>\n<p>The above-mentioned works covered by the collaboration agreement between the State and the Canary Islands concerning water will be executed by several companies.<\/p>\n<p>The works are divided into three blocks:<\/p>\n<ul type=\"disc\">\n<li>PUERTO DEL ROSARIO\u2013CORRALEJO PIPELINE<\/li>\n<\/ul>\n<p>The works basically consist of constructing three regulating tanks that can contain 5,000 m3 each. There will also be a new general pipe system with a large capacity (10,000 m3\/day) that will connect the Corralejo, Puerto del Rosario and Gran Tarajal desalination plants, totalling around 71 km of pipes. These works will be completed by the MATIAS MARRERO\u2013MAXODIVER joint venture.<\/p>\n<ul type=\"disc\">\n<li>2nd PHASE OF THE PUERTO DEL ROSARIO SEAWATER DESALINATION PLANT<\/li>\n<\/ul>\n<p>The works consist of increasing the production of desalinated water by 14,000 m3\/day, by installing two reverse osmosis racks of 7,000 m3\/day each. These works will be completed by the DEGREMONT\u2013MAXODIVER joint venture.<\/p>\n<ul type=\"disc\">\n<li>EL COTILLO WASTEWATER TREATMENT STATION<\/li>\n<\/ul>\n<p>The design flow of the new treatment plant is 500 m3\/day in two lines of 250 m3\/day each. These works will be completed by the DEBEOCAN\u2013CORPE joint venture.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Ministry of Agriculture, Livestock, Fisheries and Water of the Government of the Canary Islands has awarded the contract for &#8220;Technical Assistance Services for the Management, Monitoring and Supervision of Fuerteventura Projects&#8221; to SISTEMA INGENIERIA. The above-mentioned works covered by the collaboration agreement between the State and the Canary Islands concerning water will be executed [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":75623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10],"tags":[],"acf":[],"_links":{"self":[{"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/posts\/1026"}],"collection":[{"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/comments?post=1026"}],"version-history":[{"count":0,"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/posts\/1026\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/media\/75623"}],"wp:attachment":[{"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/media?parent=1026"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/categories?post=1026"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/3.65.241.247\/en\/wp-json\/wp\/v2\/tags?post=1026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}